We use cookies. Find out more about it here. By continuing to browse this site you are agreeing to our use of cookies.
#alert
Back to search results
Remote

Jr. Project Scheduler

Insitiform Technologies, LLC
vision insurance, paid time off, tuition assistance, 401(k)
United States, Massachusetts
Jan 27, 2025

Insituform Technologies LLC,an Azuria Company,is looking for an experienced Project Scheduler.

Insituform Technologies LLCis a leading worldwide provider of cured-in place pipe (CIPP) and other technologies and services for the rehabilitation of pipeline systems. Insituform's businesses consist of sewer, drinking water and energy and mining pipeline rehabilitation and protection. The Company provides cost-effective solutions to remediate operational, health, regulatory and environmental problems resulting from aging and defective pipelines. Insituform's technologies allow its customers to avoid the extraordinary expense and extreme disruption that can result from traditional "dig and replace" methods.

Responsibilities:

  • Assist the scheduling team in the maintenance and development of construction project schedules using Primavera P6 Software. (version 8.2 or higher preferred).
  • Generate periodic reports on productivity, labor, and forecasting.
  • Provide and coordinate weekly schedule updates needed to support the construction management efforts of the project.
  • Work with project teams to identify and sequence key construction activities, create resource and/or cost-loaded schedules with key materials and resources, setting up the project baseline, updating progress, and reporting.
  • Provide support of related project scheduling activities including project baseline schedules, critical path analysis, project planning and forecasting, progress validation, performance measurement.
  • Manage changes to the schedules and keep the team aware of the impacts.
  • Participate in the maintenance of periodic (weekly, monthly, quarterly) status reports to keep Management and/or Customers informed on project progress.
  • Working knowledge of general project management principles (e.g., risk analysis, scope control, logic driven work, and quality assurance).
  • Flexible, detail-oriented team player with the ability to manage multiple tasks, produce quality work, and consistently meet tight deadlines in a fast-paced environment.

Qualifications:

  • 1-yearexperience with Primavera P6, Project Scheduling, or Construction Project Management.
  • Solid working knowledge of Excel preferred.
  • Ability to read, analyze, and interpret complex documents.
  • Ability to respond effectively to highly sensitive inquiries or complaints.
  • Strong written and verbal communication skills.
  • Ability to define problems, collect data, establish facts, and draw valid conclusions.
  • Ability to work within a team organization and provide input and recommendations to the organization.
  • Occasional travel of less than 5% may be required.

We offera competitive salary with career growth opportunities and a full benefits package including medical, dental, and vision Insurance, prescription drug coverage, annual bonus potential, 401k matching, tuition assistance, overtime pay,paid time off,and much more.

Azuria is an Equal Opportunity Employer.Equal opportunity is a sound and just concept to which Azuria is firmly bound. Azuria will not engage in discrimination against, or harassment of, any person employed or seeking employment with Azuria on the basis of race, color, religion, sex, sexual orientation, gender identity,national origin, age, non-disqualifying disability, status as a protected veteran or other characteristics protected by law.

VEVRAA compliant - priority referral Protected Veterans requested

Applied = 0

(web-6f6965f9bf-tv2z2)