We use cookies. Find out more about it here. By continuing to browse this site you are agreeing to our use of cookies.

Job posting has expired

#alert
Back to search results

Project Scheduler

Kokosing, Inc.
paid time off, 401(k)
United States, Michigan, Sault Ste. Marie
Aug 14, 2026

Kokosing (www.kokosing.biz) is one of America's 50 largest General Contractors and services a broad spectrum of clients in both the private and public business sectors. Kokosing's services include heavy civil/industrial construction such as highways, bridges, underground utilities, water/wastewater facilities, and marine construction. For over 75 years, Kokosing has successfully attracted the most qualified technical personnel in the construction industry by offering visible challenges, superior quality, and attractive rewards. With over $2.8 billion in annual sales and a commitment to its workforce, Kokosing is the winning team.

Job Description:

Summary:

  • This role will be located onsite at the construction project site located in Sault Ste. Marie, MI.
  • Collects and analyzes information used to plan and schedule construction projects, specifically, the $1.8B New Lock at the Soo Project for the US Army Corps of Engineers located in Sault Ste. Marie, MI. (projected to complete in Year 2029)
  • Generates forecasts, variance reports, and other documentations used to monitor and manage project construction schedules.
  • Integrate best practices and project deliverables while interfacing with the Project Team, Project Managers, Subcontractors, Design Engineers to monitor and update the project schedule and resources.
  • The onsite project office trailer is modern - climate controlled, LED lighting, restroom facilities, Wi-Fi/network access, I.T. Equipment, etc.

Essential Duties and Responsibilities:

  • Lead a small team of schedulers to create the baseline schedules for newly awarded contract options and maintain the working schedule as reported out weekly and monthly in the Owner/Contractor/LLC (stakeholder) meetings.
  • Responsible to ensure that the project schedule updates and reports conform to the contract specifications and are prepared for formal submittal to the Government.
  • Responsible to create and maintain a comprehensive schedule narrative with each formal update.
  • Responsible for preparing all the project progress reports, integrating subcontractor look ahead schedules into the master schedule, revising logic sequence as required.
  • Reviewing contractor project schedules for accuracy and logic and analyzing critical path updates, schedule progress vs what is occurring in the field, and evaluating schedule options - then communicating schedule status to the Project Manager, client, consultants, and others.
  • Reporting schedule status to all stakeholders on a weekly / monthly basis.
  • Facilitate monthly schedule reviews with the Government.
  • Assist the Project Team in maintaining, updating and monitoring the CPM schedule.
  • Maintaining project schedule(s) and alerting the project team to potential problem areas.
  • Performing Time Impact Analysis (TIA).
  • Various reports could include:
    • Progress charts
    • Work intensity curves
    • Labor-production work rate tables
    • Time impact analyses
    • Equipment delivery schedules
    • Resource-cost loaded schedules
    • Daily construction activities report schedules
  • Instruct and coach subordinate schedulers in scheduling best practices and assign tasks as needed.
  • Other duties as assigned.

Education and Experience:

  • A Bachelor's Degree in Engineering, Construction Management, or Business Administration preferred or experience in lieu of degree.
  • Ideal candidates will possess 8+ years of experience in Project Scheduling, preferably in heavy civil and heavy industrial construction projects.
  • Proficiency in Primavera P6 and Oracle Primavera Cloud.
  • Excellent written and verbal communication skills.
  • Prior experience developing project schedules and performing critical path, earned value, and schedule impact analysis is preferred.
  • Ability to work in concert with project team, subcontractors, engineers, and customer.
  • Project Site Access requires a Federal Background Check

Benefits:
Kokosing offers a competitive compensation and benefits package including medical, life, and disability insurance, paid time off and a 401K plan.

Kokosing is an equal employment opportunity/affirmative action federal and state contractor. The company does not discriminate on the basis of race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, veteran status, or any other protected class.

(web-77cf7d65c7-hdvh7)